Modification of a boiler in ContourGlobal Maritsa East 3 Power Plant in Bulgaria with Primary Measures to reduce the level of normalized NOx emissions below 180 mg/Nm3 (normalized at 6 % O2)

ContourGlobal Maritsa East 3 AD

Analysis of operational data;
Review of actual status and design of boiler, air and fuel systems;
Design of Primary measures modifications to reduce the level of normalized NOx emission below 180 mg/Nm3 (normalized at 6 % O2);
Production and issue of manufacturing and assembly drawings in accordance with EU and Bulgarian standards and regulations and issuing of O&M manuals for all affected equipments;
Supervision of manufacturing and erection of all designed modifications;
Commissioning and performance testing;
Production and issue of as built drawings;
Option for manufacturing of all designed modifications;
Option for erection of all designed modifications;
Option for design of modification for other 3 boilers in ContourGlobal Maritsa East 3 Power Plant;
The boilers are fed with lignite with calorific value between 1 400 and 1 750 kcal/kg;
Each boiler feeds a 227 MW turbine;
Option for manufacture of all designed modifications for the remaining 3 boilers;
Option for erection of all designed modifications for the remaining 3 boilers.

Краен срок
Срокът за получаване на офертите беше 2011-11-21. Обществената поръчка беше публикувана на 2011-10-14.

Кой?

Какво?

Къде?

История на обществените поръчки
Дата Документ
2011-10-14 Обявление за поръчка
2011-10-17 Допълнителна информация
2012-02-16 Допълнителна информация