Supply of Steel Line Pipe for the natural gas Interconnector Greece–Bulgaria (IGB Project)
The contract concerns the supply of Steel Line Pipe for the IGB Project.
The IGB pipeline shall transport natural gas from Komotini (Greece) to Stara Zagora (Bulgaria).
Length: approx. 170 km.
Diameter: 28” (subject to confirmation).
Working Pressure: 75 barg.
Service: Sweet natural gas.
Design Code: EN 1594 and applicable national law.
The Steel Line Pipe shall be manufactured and tested in accordance with Contracting Entity’s project specifications which will be issued with the invitation to tender to the qualified Candidates.
The above information is preliminary and is subject to the ongoing development of design.