The contract concerns the supply of steel line pipe for the IGB Project.
The IGB Pipeline shall transport natural gas from Komotini (Greece) to Stara Zagora (Bulgaria).
Pipeline Length: approx. 183 km
Pipe Diameter: 32”
Design Pressure (DP= 8,0 MPa)
Working Pressure: Maximum Operating Pressure (MOP = 7.5 MPa)
Service: Sweet natural gas
Design Code: EN 1594:2009 (Gas supply systems - Pipelines for maximum operating pressure over 16 bar - Functional requirements) and applicable national laws
The steel line pipe shall be manufactured and tested in accordance with EN 10208-2 and Contracting Entity's Technical Specifications which will be issued with the Invitation to Tender to the qualified (pre-selected) Candidates.
Краен срок
Срокът за получаване на офертите беше 2013-03-07.
Обществената поръчка беше публикувана на 2013-01-28.
Кой?
Какво?
История на обществените поръчки
Дата |
Документ |
2013-01-28
|
Обявление за поръчка
|