FEED, EIA, arrangement of approvals, preparation of documentation for procurement procedures regarding natural gas Interconnector Greece–Bulgaria (IGB project)

"ICGB" AD

The contract covers the provision, for the gas Interconnector Greece – Bulgaria (IGB) project, of:
1. Front end engineering and design (FEED) services, including technical design and detailed spatial plan–parcelling plan (DSP-PP)-final plan;
2. Environmental impact assessment (EIA);
3. Preparation of documentation for procurement procedures (detailed description of the Subject of procurement, technical specifications, model tender, draft contract, instructions to tenderers and selection criteria, draft time schedule) for line pipe supply and LLI contracts, and EPC contract; provision of assistance in preparation and conduct of procurement procedures, including through participation in relevant evaluation commissions.
The main technical components of the IGB Project are: ~ 168,5 km, of which ~140 km in Bulgaria, 28” (~700 mm) diameter high pressure natural gas transmission pipeline between Komotini in Greece and Stara Zagora in Bulgaria; pigging facilities; block valve stations; metering / pressure regulating stations; dispatching centre and O&M base; integrated control and telecommunication systems; and all other elements, systems and facilities to support the infrastructure.
Relevant feasibility study results for the IGB project will be provided to the contractor.

Краен срок
Срокът за получаване на офертите беше 2011-02-10. Обществената поръчка беше публикувана на 2011-01-12.

Доставчици
Следните доставчици са споменати в решенията за възлагане или в други документи за обществени поръчки:
Кой?

Какво?

История на обществените поръчки
Дата Документ
2011-01-12 Обявление за поръчка
2011-09-27 Обявление за възлагане на поръчка