2013-01-28Supply of steel line pipe for the Natural Gas Interconnector Greece–Bulgaria (IGB Project) ("ICGB" AD)
The contract concerns the supply of steel line pipe for the IGB Project.
The IGB Pipeline shall transport natural gas from Komotini (Greece) to Stara Zagora (Bulgaria).
Pipeline Length: approx. 183 km
Pipe Diameter: 32”
Design Pressure (DP= 8,0 MPa)
Working Pressure: Maximum Operating Pressure (MOP = 7.5 MPa)
Service: Sweet natural gas
Design Code: EN 1594:2009 (Gas supply systems - Pipelines for maximum operating pressure over 16 bar - Functional requirements) and applicable national laws
The steel line …
Преглед на обществените поръчки »
2012-08-13Design appraisal and verification services for certification of the interconnector Greece – Bulgaria gas... ("ICGB" AD)
The contract shall cover the appraisal of the Front End Engineering Design (FEED) output for IGB Project and verification of its compliance with selected codes and standards and project specifications. It is noted that the requested services are intended as a step in a certification process for the IGB-Project. Inspection andconstruction surveillance may be sought later for the execution phase. This would be the subject of a separatecompetitive procurement at a later stage.
The services cover the …
Преглед на обществените поръчки »
2012-04-12Design appraisal and verification services for certification of the interconnector Greece – Bulgaria gas pipeline... ("ICGB" AD)
The contract shall cover the appraisal of the Front End Engineering Design (FEED) output for IGB Project and verification of its compliance with selected codes and standards and project specifications. It is noted that the requested services are intended as a step in a certification process for the IGB-Project. Inspection and construction surveillance may be sought later for the execution phase. This would be the subject of a separate competitive procurement at a later stage.
The services cover the …
Преглед на обществените поръчки »
2011-07-06Supply of Steel Line Pipe for the natural gas Interconnector Greece–Bulgaria (IGB Project) ("ICGB" AD)
The contract concerns the supply of Steel Line Pipe for the IGB Project.
The IGB pipeline shall transport natural gas from Komotini (Greece) to Stara Zagora (Bulgaria).
Length: approx. 170 km.
Diameter: 28” (subject to confirmation).
Working Pressure: 75 barg.
Service: Sweet natural gas.
Design Code: EN 1594 and applicable national law.
The Steel Line Pipe shall be manufactured and tested in accordance with Contracting Entity’s project specifications which will be issued with the invitation to tender to …
Преглед на обществените поръчки »
2011-04-28Supply of line pipe for natural gas Interconnector Greece–Bulgaria (IGB Project) ("ICGB" AD)
The contract concerns the supply of line pipe for the IGB Project.
IGB pipeline shall connect Komotini (Greece) and Stara Zagora (Bulgaria).
Length: approx. 168,5 km.
Diameter: 28” (subject to confirmation).
Design code: EN 1594 and applicable national law.
The linepipe shall be manufactured and tested in accordance with Contracting Entity’s project specifications which will be issued with the invitation.
The above information is preliminary and is subject to the ongoing development of design.
Преглед на обществените поръчки »